Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/44/d264114758/htdocs/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/44/d264114758/htdocs/wp-content/plugins/revslider/includes/operations.class.php on line 2862

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/44/d264114758/htdocs/wp-content/plugins/revslider/includes/output.class.php on line 3708
STRUCTURE – WP | ARC

STRUCTURE

The existing office structure consists of various core teams with specialized competences and a flat hierarchy.
These core teams are working interdisciplinary in all planning areas:

Project development

– Master planning
– Development of concepts
– Visualization
– Preliminary design
– Design

Project handling

– Documents for the planning application (russian TEO possible)
– Construction documentation
– Development and realization of details
– Tender documents, placing, billing
– Site management

Project design

– Industrial design
– Interior design

Project management

– Preliminary study
– Feasibility study
– Room and functional programs
– Calculation of passenger volume and baggage handling
– Landscape architecture and information system
– Building service engineering
– Time and cost planning and controlling
– Consultancy of the client during contractual performance