Airport Hannover. Night-mail handling hall – WP | ARC

Airport Hannover. Night-mail handling hall

Landside delivery ensues via the distribution hall with 6 truck docking stations / loading bridges and 27 Sprinter docking stations / ramps.
Connected to the distribution hall are office spaces, social rooms and building services areas.
The safety boundary between the air side and land side in the distribution hall is defiende over the entire room and is determined operationally.
On the air side, the airmail is delivered via trollies and conveyor belts.

Services:

General planning (building, statics, outdoor facilities)
Base estimates
Preliminary design
Design
Tender and placing

Project details:

  • Planning period: 2011
  • Construction period: 2012
  • GV: ca. 11.000 m³
  • GFA: ca. 1.300 m²
  • Costs: ca. 1,6 Mio €