Subway station Heinrich-Heine-Allee – WP | ARC

Subway station Heinrich-Heine-Allee

The reconstruction project of Heinrich-Heine-Allee in cooperation with APB Architekten, Mühlheim.

The focus of the project is on the following technical aspects:

·         The reconstruction and modernization of fire prevention system for the entire station including technical facilities and engineering systems collector;
·         The integration of the haptic navigation system
·         The reconstruction of the ceiling
·         The installation of smoke screens in staircases

Scope of services:

·         Concept Design
·         Design Development
·         Technical Design
·         Detailed planning

Project details:

  • Planning period: 2012 - 2014
  • GFA: 2.250 m²
  • Costs: 8,1 millions € (netto)