Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/44/d264114758/htdocs/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/44/d264114758/htdocs/wp-content/plugins/revslider/includes/operations.class.php on line 2862

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/44/d264114758/htdocs/wp-content/plugins/revslider/includes/output.class.php on line 3708
Subway station Nordstrasse (NOS), Düsseldorf – WP | ARC

Subway station Nordstrasse (NOS), Düsseldorf

Design, Technical Design, Bidding, reconstruction of the fire prevention system, reconstruction of the ceiling, modernization of haptic navigation system, and elevators.

Project details:

  • Planning period: 2012-2016
  • Construction cost, building lot 1 (without shell construction, road construction): 1,6 Mio €
  • Construction cost total: 4,6 Mio €