Untitled Document
Subway station Mainstation (DHB)

In cooperation with Büro APB, Düsseldorf

Subway station Main station (DHB):
Optimisation of the fireprevention measures
Smoke protection in staircases
Subsequent addition of the tactile orientation system on the platform
Renovation of the tiled floor and suspended ceilings Signage

 

Project details

Planning period: since 2012
Construction period: 2018
GV: ca. 7.500 m3
GFA: ca. 2.500 m2
Costs: 7,6 mio. € (netto)