Airport Hannover. Night-mail handling hall
Project details:
Planning period: 2011
Construction period: 2012
GV: ca. 11.000 m³
GFA: ca. 1.300 m²
Costs: ca. 1,6 Mio €
Planning period: 2011
Construction period: 2012
GV: ca. 11.000 m³
GFA: ca. 1.300 m²
Costs: ca. 1,6 Mio €
Landside delivery ensues via the distribution hall with 6 truck docking stations / loading bridges and 27 Sprinter docking stations / ramps.
Connected to the distribution hall are office spaces, social rooms and building services areas.
The safety boundary between the air side and land side in the distribution hall is defiende over the entire room and is determined operationally.
On the air side, the airmail is delivered via trollies and conveyor belts.
Services:
General planning (building, statics, outdoor facilities)
Base estimates
Preliminary design
Design
Tender and placing