Subway station Mainstation (DHB)

 

Project details:

Planning period: since 2012

Construction period: 2018

GV: ca. 7.500 m3

GFA: ca. 2.500 m2

Costs: 7,6 mio. € (netto)

 

The development of Construction Documents and Bidding for the improvement of Dusseldorf Central subway station in cooperation with bureau APB (Mühlheim)

The focus of the project is on the following technical aspects:

·         The integration of the haptic navigation system with complete replacement of floors on the platform and adjacent areas
·         The replacement of elevators
·         The whole reconstruction of the ceiling including the creation of new stylistic and the necessary technical requirements
·         The reconstruction and modernization of the fire prevention system
·         Technical visualization of the fire prevention system