Subway station Heinrich-Heine-Allee WHL
Project details:
Planning period 2014 – 2015
Construction period 2015
GV appr.. 1000 cbm
GFA ca. 300 qm
Costs
2,0 Mio. € (netto)
Planning period 2014 – 2015
Construction period 2015
GV appr.. 1000 cbm
GFA ca. 300 qm
Costs
2,0 Mio. € (netto)
The reconstruction project for the connection of subway station Heinrich-Heine-Allee and Wehrhahn line (level A). The development of Concept Design, Design Development, Technical Development, Bidding. The scope of work consist of integration of haptic navigation system, replacement of counter ceiling, development of new lighting system concept in cooperation with Bartenbach, Aldrans (Austria), reconstruction of staircases.