Subway station Heinrich-Heine-Allee WHL

 

Project details:

Planning period 2014 – 2015

Construction period 2015

GV appr.. 1000 cbm

GFA ca. 300 qm

Costs

2,0 Mio. € (netto)

 

The reconstruction project for the connection of subway station Heinrich-Heine-Allee and Wehrhahn line (level A). The development of Concept Design, Design Development, Technical Development, Bidding. The scope of work consist of integration of haptic navigation system, replacement of counter ceiling, development of new lighting system concept in cooperation with Bartenbach, Aldrans (Austria), reconstruction of staircases.