Subway station Heinrich-Heine-Allee
Project details:
Planning period: 2012 – 2014
GFA: 2.250 m²
Costs: 8,1 millions € (netto)
The reconstruction project of Heinrich-Heine-Allee in cooperation with APB Architekten, Mühlheim.
The focus of the project is on the following technical aspects:
· The reconstruction and modernization of fire prevention system for the entire station including technical facilities and engineering systems collector;
· The integration of the haptic navigation system
· The reconstruction of the ceiling
· The installation of smoke screens in staircases
Scope of services:
· Concept Design
· Design Development
· Technical Design
· Detailed planning