Subway station Nordstrasse (NOS), Düsseldorf

 

Project details:

Planning period: 2012-2016

Construction cost, building lot 1 (without shell construction, road construction): 1,6 Mio €

Construction cost total: 4,6 Mio €

Design, Technical Design, Bidding, reconstruction of the fire prevention system, reconstruction of the ceiling, modernization of haptic navigation system, and elevators.